this month i have ordered a set of inverted tripple trees/forks offered by Jason Hall. He said the inverts should be done early this week. He has a set of 2001 cr125 forks that he is shortening 3" for proper ride height and rebuilding as well.
APT has stated my new 38mm cast smart carb should arrive on the 28th of this month.

The bottom gusset is actually already flipped on this Billy frame for the 500 motor, so I didn't have to notch it for clearance.

See this picture for what the normal 250r frame looks like and the highlighted marker spot is what needs to be cut for clearance so there's no binding and you get full suspension travel.
[ATTACH=CONFIG]186637[/ATTACH] picture above compliments of Auusiedunne from OZ forums
I slapped a coat of primer on it because the frame was an ugly mess, now it's a little less ugly

the bike will be torn back down after the little Sahara ride in march so I can powder coat the frame and all associated parts.

2007 450r swinger assembly bolted on, need to find a rear shock to run.
